Магистр ДонНТУ Шнырев Роман Петрович
Shnyrev Roman Petrovich
 
Faculty: Mountain-geologicial
 
Speciality: CONSTRUCTON OF THE MINES AND THE UNDERGROUND STRUCTURES equipment
 
Theme of master's work: "Increasing the efficiency of the drilling and blasting operations when digging the shafts"
 
Leader of work: Kupenko Ivan Vladimirovich
 
E-mail: roman_shnyrev@ukr.net
 


Abstract
 
INTRODUCTION. THE SUBSTANTIATION OF THE URGENCY OF THE THEME

        Actions for reconstruction operating and to building of the new collieries, provided by power strategy of Ukraine, are impossible without a construction of great volume of capital mountain developments among which the special place on technological specificity and the functional importance is occupied with vertical trunks of different function. In the general complex of mountain developments of modern mine on a share of trunks it is necessary to 30 % of cost and to 50 % of general time of building.

        Last years practically all vertical trunks of collieries in our country were constructed with application drilling-and-blasting technologies. drilling and blasting operation are one of the major elements sinking cycle – their relative density in total amount in some cases can reach 40 … 50 %. The main feature of conducting explosive works in trunks is water presence in heading and in blastholes. It is necessary to notice, that level of technical and economic indicators and safety of explosive works at passing vertical mine trunks far is not always high enough. In practice incomplete detonations blasthole charge of explosives (explosive), and also low values of operating ratio blastholes often enough take place, that in particular leads to increase in duration of cleaning of breed in II phase assuming use of unproductive manual skills of drifters, to 35 % from general time of loading of breed. It is possible to explain such state of affairs an insufficient level of scrutiny of process of destruction of rocks explosion of charges water filled blastholes, application of the same designs blasthole charge under various conditions of detonation. On the basis of the aforesaid it is possible to conclude, that perfection of technology of explosive works for the purpose of reduction of time of cleaning of breed and sinking cycle as a whole at passing vertical trunks – an actual scientific and technical problem.
        One of possible ways of the decision of this problem is working out of designs blasthole charge explosive which application would allow to strengthen explosion influence on the bottom part drilling a file and thereof to reduce expenses of work and time for breed cleaning in II phase.

 
THE PURPOSE AND WORK PROBLEMS

        The work purpose consists in increase of efficiency and safety of explosive works at passing vertical mine trunks.

        Research problems:
        • To make the analysis of references on a theme of the given work;
        • To make theoretical researches of action of explosion blasthole charge explosive with an inert interval between its parts on environment;
        • To make laboratory experiments on studying of influence of various properties of a material of an inert interval between fighting and passive parts of charge explosive which is blown up in filled water blasthole, on size of a radial impulse from explosion of a passive part of a charge;
        • On the basis of the spent researches to develop a design blasthole harge explosive for strengthening of influence of explosion on a benthonic part blasthole in drilling a file of rocks;
        • To estimate possible economic benefit of application of the developed design blasthole charge explosive at passing vertical mine trunks.

list references

        1.  Novik Е.B., Levit V.V., Kupenko I.V. Carrying out experience drilling and blasting operation at high-speed passings airfeeder trunk <>