RUS | UKR | DonNTU || Master's portal of DonNTU
Ìàãèñòð ÄîíÍÒÓ Áåëü÷óêîâ Ìàêñèì Èãîðåâè÷

Maxim Belchukov

Faculty "Mining and Geology"

Department "Marksheideri of business"

Speciality "Marksheideri of business"

Development of a design, drafting, securing points on the areas, instrumental measurements, compensating for the calculation establishing a laboratory for conducting practices on higher geodesy and its introduction into the educational process

Scientific adviser: Viacheslav Mirniy



Resume

Essay on the theme of the work


Content

Relevance
Purpose and tasks of research
Concept of Thesis and target of research
Scientific novelty and practical relevance
Subject and method of research
Summary of subject research at Donetsk National Technical University
Summary of subject research in Ukraine
Main contents of works
Conclusion

Relevance

    Curriculum of training bachelors, specialists and masters of Mine Surveying Chair involves learning the course “Higher Surveying and Fundamentals of Photogrammetry”, which includes practical training. During the practical training on Higher Surveying there are carried out angular surveying, optical distance measurement and geometric leveling of the 03rd and 4th grades. It is necessary somehow to control such works, therefore, they should be carried out on the site, which has been already explored and measured with higher accuracy. Thus, creation of high-precision geodesy and mine surveying site is relevant for accomplishment of complete practical training on Higher Surveying.
    Our University doesn’t have such site, without this site it is impossible to make complete learning process in many disciplines of Mine Surveying specialty, as well as provide proper training of future specialists in this field. Therefore, I consider the topic of my Master's Thesis to be relevant and practicable. Master’s Thesis is written on request of Mine Surveying Chair.

Purpose and tasks of research

   The purpose of Thesis is obtaining of standard geodesy and mine surveying site, which by its structure and accuracy would correspond with all set requirements. The research tasks are the following: a) field reconnaissance and selection of areas for laying of points centers of sites; b) direct laying (concrete lining) of points centers; c) performance of necessary works on preparation of high-precision measuring devices and instruments; d) conduct of field observations on the created site; e) processing of measurements and equalizing calculations f) appraisal of measurements accuracy and inspection of site conformity with due requirements.

Concept of Thesis and target of research

   Main concept of Thesis is to create reference site for the Chair in order to build triangulation, trilateration network and closed leveling lines.
   Target of research is methodology of performance of field observations in order to create high-precision network during the practice on Higher Surveying.


Scientific novelty and practical relevance

   As was said above, our University doesn’t have such site. Its creation and involvement into academic activity will improve and simplify considerably studying of students on Mine Surveying specialty in discipline “Higher Surveying and Fundamentals of Photogrammetry”, therefore, in my opinion, such Thesis may be referred to the field of scientific novelty and considered to be practically useful.


Subject and method of research

   Subject of research is created system of points, fixed on the tops of mountain heaps, located not far from premises of Mine Surveying Chair, which form reference training geodesy and mine surveying site.


Summary of subject research at Donetsk National Technical University
          Donetsk National Technical University doesn’t have such site. Works on creation of site were conducted together with my groupmate Salashny D., part of these works was included into the Special Section of Specialist Graduation Project.


Summary of subject research in Ukraine

         Publications of such work performance were not found in Ukraine.

Main contents of works

         Works began from planning of project of high-precision site for geodesy and mine surveying research. During this planning there were made the following requirements:
         - all points should have intervisibility among themselves;
         - the site will be used for the long time, therefore, all points should be rigid and reliable;
         - as points centers should be supported by altitude basis, its structure should enable to use them as monumented bench mark;
         - as points can be used in work with GPS or GLONASS navigation system devices, there should be provided open horizon visibility from each point during 300 minutes.;
         - in order to receive sufficiently exact value of angular dimensions according to the data of calculations, its linear elements should be defined with inaccuracy, which doesn’t exceed 5-8 mm;
         - the surrounding area should provide, in the future, ability to build up planned first stage of site.
         Preliminary reconnaissance proved ability, in order to perform stated requirements, to use old mountain heaps as areas of laying. Use of these dumps was stopped about 50 years ago, filled up rock turned to be solid mass, and in several places it hardened into stone mass due to the past chemical reactions and internal burning.
         Thus, points centers of site are located on the tops of mountain heaps (dumps) nor far from premises of Mine Surveying Chair. Layout of points is given on Figure 1.

Figure 1 – Layout of location of points centers of site

         For each point there were excavated 0,6 ì, depth pits, and 0,8 ì long metal core with welded stainless steel upper part, which has 7 ìì depth hole and 1 ììdiameter for more precise centering over the point. Visible stainless steel part, which sticks out of concrete 1-2 cm tall, which will secure less vulnerability to exposure of external destructive factors and corrosion. Structural diagram of point is given on Figure 2.


Figure 2 – Structural diagram of site point

         Between all points distances will be measured by tellurometer, which will secure inaccuracy of measurements 2-5 mm under ordinary weather conditions. Geometrical leveling of the 03rd class is performed in order to find corrections across the slope of line between the points.
During such measurements each side of site will be known with fractional error not less than 1:2000. Error of each angle may be defined according to the following formula:


         Wherein - error of side measurement;
            À,Â,Ñ–angles in triangles, indicated clockwise;
            b– side length opposite to angle B (numeration of sides in triangle is indicated by letters a, b, c according to the ordinary rule of angle contrast);
             = 206265".
         According to the preliminary calculations average square errors on site will not exceed 5 seconds.
         In view of the foregoing it is possible to make conclusion that created site on its accuracy and structure will correspond with all due requirements.

Conclusion


         At this moment my Master’s Thesis hasn’t been completed yet. The results may be known after defence of Thesis at Mine Surveying Chair in January, 2012.