Болт
Магистр ДонНТУ Марьенков Вадим Станиславович

Марьенков Вадим Станиславович

Факультет компьютерных информационных технологий и автоматики
Кафедра АТ
группа СУА-07м

Тема научной работы: "Исследование системы управления магнитным подвесом высокоскоростного наземного транспорта"

Научный руководитель: Рафиков Гыяз Шагиевич

e-mail:   marvastan@gmail.com

Болт
 
 
 
 
 
 
 
Болт Болт

Болт Болт
Главная страница ДонНТУ
Портал магистров
Автореферат
Автобиография
Библиотека
Ссылки
Результаты поиска
Софиевский парк - жемчужина паркового искусства Украины
Болт Болт
  Болт Болт

Maglev (transport) Статья из Википедии - свободной энциклопедии повествующая о новом виде транспорта на магнитном подвесе.

Ссылка на источник: http://en.wikipedia.org/wiki/Maglev_(transport)

       A maglev, or magnetically levitating train is a form of transportation that suspends, guides and propels vehicles (predominantly trains) using electromagnetic force. This method has the potential to be fast and quiet when compared to wheeled mass transit systems, potentially reaching velocities comparable to turboprop and jet aircraft (900 km/h, 600 mph). The highest recorded speed of a maglev train is 581 km/h (361 mph), achieved in Japan in 2003, 6 km/h higher than the conventional TGV speed record.
       History
       In the 1960s, Great Britain held the lead in maglev research; Eric Laithwaite, Professor of Heavy Electrical Engineering at Imperial College, developed a functional maglev passenger vehicle. It weighed 1 ton (1 tonne) and could carry four passengers. Additional funding for his work was also provided by British Rail, the British Transport Commission, Manchester University, Surrey University and the Wolfson Foundation. His maglev had one mile (1.6 km) of track and was thoroughly tested, but his research was cut off in 1973 due to lack of funding; and his progress was not sufficient. British Rail also set up a Maglev Experimental Centre at their Railway Technical Centre based at Derby.
       In the 1970s, Germany and Japan also began research and after some failures both nations developed mature technologies in the 1990s.
       First patents
       High speed transportation patents would be granted to various inventors throughout the world. Early United States patents for a linear motor propelled train were awarded to the inventor, Alfred Zehden (German). The inventor would gain U.S. Patent 782,312 (June 21, 1902) and U.S. Patent RE12,700 (August 21, 1907). In 1907, another early electromagnetic transportation system was developed by F. S. Smith. A series of German patents for magnetic levitation trains propelled by linear motors were awarded to Hermann Kemper between 1937 and 1941. An early modern type of maglev train was described in U.S. Patent 3,158,765 , Magnetic system of transportation, by G. R. Polgreen (August 25, 1959). The first use of "maglev" in a United States patent was in "Magnetic levitation guidance" by Canadian Patents and Development Limited.
       Hamburg, Germany 1979
       There is conflict in this information. Transrapid 05 was the first maglev train with longstator propulsion licensed for passenger transportation. In 1979 a 908 m track was open in Hamburg for the first International Transportation Exhibition (IVA 79). There was so much interest that operation had to be extended three months after exhibition finished, after carrying more than 50,000 passengers. It was reassembled in Kassel in 1980.
       Birmingham, England 1984–1995
       The world's first commercial automated system was a low-speed maglev shuttle that ran from the airport terminal of Birmingham International Airport to the nearby Birmingham International railway station from 1984 to 1995. Based on experimental work commissioned by the British government at the British Rail Research Division laboratory at Derby, the length of the track was 600 meters (1,969 ft), and trains "flew" at an altitude of 15 millimeters (0.6 in). It was in operation for nearly eleven years, but obsolescence problems with the electronic systems (lack of spare parts) made it unreliable in its later years and it has now been replaced with a cable-drawn system. One of the original cars now sits in part of the airport.
       Several favourable conditions existed when the link was built:

  1. The British Rail Research vehicle was 3 tons (3 tonne) and extension to the 8 ton (8 tonne) vehicle was easy.
  2. Electrical power was easily available.
  3. The Airport and rail buildings were suitable for terminal platforms.
  4. Only one crossing over a public road was required and no steep gradients were involved
  5. Land was owned by the Railway or Airport
  6. Local industries and councils were supportive
  7. Some Government finance was provided and because of sharing work, the cost per organization was not high.

       Japan, 1980s
       Maglev speeds on the Miyazaki test track had regularly hit 517 km/h by 1979, but after an accident that destroyed the train, a new design was decided upon. Tests through the 1980s continued in Miyazaki before transferring a far larger and elaborate test track (20 km long) in Yamanashi in the late 1990s.
       In Tsukuba, Japan (1985), the HSST-03 (Linimo) wins popularity in spite of being 30 km/h slower Tsukuba World Exposition. In Okazaki, Japan (1987), the JR-Maglev took a test ride at the Okazaki exhibition. In Saitama, Japan (1988), the HSST-04-1 was revealed at the Saitama exhibition performed in Kumagaya. Its fastest recorded speed was 30 km/h. In Yokohama, Japan (1989), the HSST-05 acquires a business driver's license at Yokohama exhibition and carries out general test ride driving. Maximum speed 42 km/h.
       Vancouver, Canada & Hamburg, Germany 1986-1988
       In Vancouver, Canada (1986), the JR-Maglev took a test ride at holding Vancouver traffic exhibition and runs. In Hamburg, Germany (1988), the TR-07 in international traffic exhibition (IVA88) performed Hamburg.
       Berlin, Germany 1989–1991
       In West Berlin, the M-Bahn was built in the late 1980s. It was a driverless maglev system with a 1.6 km track connecting three stations. Testing in passenger traffic started in August 1989, and regular operation started in July 1991. Although the line largely followed a new elevated alignment, it terminated at the U-Bahn station Gleisdreieck, where it took over a platform that was then no longer in use; it was from a line that formerly ran to East Berlin. After the fall of the Berlin Wall, plans were set in motion to reconnect this line (today's U2). Deconstruction of the M-Bahn line began only two months after regular service began and was completed in February 1992.
       Commercial operation
       The first commercial Maglev "people-mover" was officially opened in 1984 in Birmingham, England. It operated on an elevated 600 metres (1,969 ft) section of monorail track between Birmingham International Airport and Birmingham International railway station. It ran at 42 km/h (26 mph) until the system was eventually closed in 1995 due to reliability and design problems.
       The best-known high-speed maglev currently operating commercially is the IOS (initial operating segment) demonstration line of the German built Transrapid train in Shanghai, China that transports people 30 km (18.6 miles) to the airport in just 7 minutes 20 seconds, achieving a top velocity of 431 km/h (268 mph), averaging 250 km/h (150 mph).
       Other commercially operating lines exist in Japan, such as the Linimo line. Maglev projects worldwide are being studied for feasibility. In Japan at the Yamanashi test track, current maglev train technology is mature, but costs and problems remain a barrier to development, alternative technologies are being developed to address those issues.
       Technology
       All operational implementations of maglev technology have had minimal overlap with wheeled train technology and have not been compatible with conventional rail tracks. Because they cannot share existing infrastructure, maglevs must be designed as complete transportation systems. The term "maglev" refers not only to the vehicles, but to the railway system as well, specifically designed for magnetic levitation and propulsion.
       There are two primary types of maglev technology:

  1. electromagnetic suspension (EMS) uses the attractive magnetic force of a magnet beneath a rail to lift the train up.
  2. electrodynamic suspension (EDS) uses a repulsive force between two magnetic fields to push the train away from the rail.

       Another experimental technology, which was designed, proven mathematically, peer reviewed, and patented, but is yet to be built, is the magnetodynamic suspension (MDS), which uses the attractive magnetic force of a permanent magnet array near a steel track to lift the train and hold it in place.
       Electromagnetic suspension
       In current EMS systems, the train levitates above a steel rail while electromagnets, attached to the train, are oriented toward the rail from below. The electromagnets use feedback control to maintain a train at a constant distance from the track, at approximately 15 millimeters (0.6 in).
       Electrodynamic suspension
       In Electrodynamic suspension (EDS), both the rail and the train exert a magnetic field, and the train is levitated by the repulsive force between these magnetic fields. The magnetic field in the train is produced by either electromagnets (as in JR-Maglev) or by an array of permanent magnets (as in Inductrack). The repulsive force in the track is created by an induced magnetic field in wires or other conducting strips in the track.
       At slow speeds, the current induced in these coils and the resultant magnetic flux is not large enough to support the weight of the train. For this reason the train must have wheels or some other form of landing gear to support the train until it reaches a speed that can sustain levitation.
       Propulsion coils on the guideway are used to exert a force on the magnets in the train and make the train move forward. The propulsion coils that exert a force on the train are effectively a linear motor: An alternating current flowing through the coils generates a continuously varying magnetic field that moves forward along the track. The frequency of the alternating current is synchronized to match the speed of the train. The offset between the field exerted by magnets on the train and the applied field create a force moving the train forward.
       Pros and cons of different technologies
       Each implementation of the magnetic levitation principle for train-type travel involves advantages and disadvantages. Time will tell us which principle, and whose implementation, wins out commercially.

Technology Pros Cons

EMS (Electromagnetic)

Magnetic fields inside and outside the vehicle are insignificant; proven, commercially available technology that can attain very high speeds (500 km/h); no wheels or secondary propulsion system needed

The separation between the vehicle and the guideway must be constantly monitored and corrected by computer systems to avoid collision due to the unstable nature of electromagnetic attraction; due to the system's inherent instability and the required constant corrections by outside systems, vibration issues may occur.

EDS (Electrodynamic)

Onboard magnets and large margin between rail and train enable highest recorded train speeds (581 km/h) and heavy load capacity; has recently demonstrated (December 2005) successful operations using high temperature superconductors in its onboard magnets, cooled with inexpensive liquid nitrogen

Strong magnetic fields onboard the train would make the train inaccessible to passengers with pacemakers or magnetic data storage media such as hard drives and credit cards, necessitating the use of magnetic shielding; limitations on guideway inductivity limit the maximum speed of the vehicle; vehicle must be wheeled for travel at low speeds; system per mile cost still considered prohibitive; the system is not yet out of prototype phase.

Inductrack System (Permanent Magnet EDS)

Failsafe Suspension - no power required to activate magnets; Magnetic field is localized below the car; can generate enough force at low speeds (around 5 km/h) to levitate maglev train; in case of power failure cars slow down on their own safely; Halbach arrays of permanent magnets may prove more cost-effective than electromagnets

Requires either wheels or track segments that move for when the vehicle is stopped. New technology that is still under development (as of 2008) and as yet has no commercial version or full scale system prototype.

       Neither Inductrack nor the Superconducting EDS are able to levitate vehicles at a standstill, although Inductrack provides levitation down to a much lower speed. Wheels are required for these systems. EMS systems are wheel-less.
       The German Transrapid, Japanese HSST (Linimo), and Korean Rotem EMS maglevs levitate at a standstill, with electricity extracted from guideway using power rails for the latter two, and wirelessly for Transrapid. If guideway power is lost on the move, the Transrapid is still able to generate levitation down to 10 km/h speed, using the power from onboard batteries. This is not the case with the HSST and Rotem systems.
       Propulsion
       An EMS system can provide both levitation and propulsion using an onboard linear motor. EDS systems can only levitate the train using the magnets onboard, not propel it forward. As such, vehicles need some other technology for propulsion. A linear motor (propulsion coils) mounted in the track is one solution. Over long distances where the cost of propulsion coils could be prohibitive, a propeller or jet engine could be used.
       Stability
       Earnshaw's theorem shows that any combination of static magnets cannot be in a stable equilibrium. However, the various levitation systems achieve stable levitation by violating the assumptions of Earnshaw's theorem. Earnshaw's theorem assumes that the magnets are static and unchanging in field strength and that permeability is constant everywhere. EMS systems rely on active electronic stabilization. Such systems constantly measure the bearing distance and adjust the electromagnet current accordingly. All EDS systems are moving systems (no EDS system can levitate the train unless it is in motion).
       Pros and cons of maglev vs. conventional trains
       Maglev trains are not compatible with conventional track, and therefore require all new infrastructure for their entire route. By contrast conventional high speed trains such as the TGV are able to run at reduced speeds on existing rail infrastructure, thus reducing expenditure where new infrastructure would be particularly expensive (such as the final approaches to city terminals), or on extensions where traffic does not justify new infrastructure.
       Due to the lack of physical contact between the track and the vehicle, Maglev trains experience no rolling friction, leaving only air resistance and electromagnetic drag, potentially improving power efficiency.
       The weight of the large electromagnets in EMS and EDS designs is a major design issue. A very strong magnetic field is required to levitate a massive train. For this reason one research path is using superconductors to improve the efficiency of the electromagnets.
       The high speed of some maglev trains translates to more sound due to air displacement, which gets louder as the trains go faster. A study found that high speed maglev trains are 5 dB noisier than traditional trains. At low speeds, however, maglev trains are nearly silent. However, two trains passing at a combined 1,000 km/h has been successfully demonstrated without major problems in Japan.
       Braking issues and overhead wire wear are problems for the Fastech 360 railed Shinkansen. Maglev would eliminate these issues, but not the noise pollution issue.
       One advantage of maglev's higher speed would be extension of the serviceable area (3 hours radius) that can outcompete subsonic commercial aircraft.
       Issues relating to magnets are also a factor. See suspension types.
       As linear motors must fit within or straddle their track over the full length of the train, track design is challenging for anything other than point-to-point services. Curves must be gentle and avoid camber, while switches are very long and need care to avoid breaks in current.
       Maglev needs very fast-responding control systems to maintain a stable height above the track; this needs careful design in the event of a failure in order to avoid crashing into the track during a power fluctuation.
       Economics
       The Shanghai maglev cost 9.93 billion yuan (US$1.2 billion) to build. This total includes infrastructure capital costs such as manufacturing and construction facilities, and operational training. At 50 yuan per passenger and the current 7,000 passengers per day, income from the system is incapable of recouping the capital costs (including interest on financing) over the expected lifetime of the system, even ignoring operating costs.
       China aims to limit the cost of future construction extending the maglev line to approximately 200 million yuan (US$24.6 million) per kilometer. These costs compare competitively with airport construction (e.g., Hong Kong Airport cost US$20 billion to build in 1998) and eight-lane Interstate highway systems that cost around US$50 million per mile (US$31 million per kilometer) in the US.
       While high-speed maglevs are expensive to build, they are less expensive to operate and maintain than traditional high-speed trains, planes or intercity buses. Data from the Shanghai maglev project indicates that operation and maintenance costs are covered by the current relatively low volume of 7,000 passengers per day. Passenger volumes on the Pudong International Airport line are expected to rise dramatically once the line is extended from Longyang Road metro station all the way to Shanghai's downtown train depot.
       The proposed Chuo Shinkansen maglev in Japan is estimated to cost approximately US$82 billion to build, with a route blasting long tunnels through mountains. A Tokaido maglev route replacing current Shinkansen would cost some 1/10th the cost, as no new tunnel blasting would be needed, but noise pollution issues would make it infeasible.
       The only low-speed maglev (100 km/h) currently operational, the Japanese Linimo HSST, cost approximately US$100 million/km to build. Besides offering improved operation and maintenance costs over other transit systems, these low-speed maglevs provide ultra-high levels of operational reliability and introduce little noise and zero air pollution into dense urban settings.
       As maglev systems are deployed around the world, experts expect construction costs to drop as new construction methods are perfected.